A Scheduling Period consists of a specific period and includes Shifts and the Shifts should all be assigned at the same time. When a Schedule is created, The Template is used to fill that period with empty Shifts. The Administrator can add and/or delete any extra Shifts. The Administrator can fill the Shifts manually by assigning a Member to each one, or by using our Autoscheduler to optimise the schedule.

Did this answer your question?